I'd like to know if TPTB have changed, or are looking at changing, the book production process so that work for future OR (If that ever happens) is easier? The idea here is that when a design is created all information needed for inclusion into an OR is also entered into a database.
The way my idea would work is that in addition to deciding where a 'Mech is assembled and the brands of it's components the locations manufacture is also decided, all this information is entered into the database. Now the DB is set up so that you can also use it to find out what is made where and so on.
I'd also like information in future TRO's that say if a new line was put together for a new design, or if it shares a line with an older one or an older one was ceased to make way for the new one.