CO p.55, top-right table, lays out times (days per item) required to install certain equipment when constructing a building.
Beyond specific items laid out this includes a "Other Equipment" item.
a) Does cargo space count under "other equipment" ?
b) If yes, are there exceptions based on type of cargo space (bulk, liquid, container...) ?