On page 212 of the fourth printing of Campaign Operations, it is stated that changing the myomer or structure type of a 'Mech requires a base time of 360 minutes. If done using salvage or replacement rules, this would also require removing all components and armor currently in the old locations (that is, unless using FrankenMech rules, all locations) and adding them to the replacement locations.
Should the time required to do this be added to the "base time" of six hours, or should that be considered part of the Class F time multiplier?